PRECONSTRUCTION APPROACH STRATEGIC PROJECT PLANNING
G. A. JOHNSON & SON will
offer the following services throughout the initial phases of the project
up to completion of bid documents: |
| Project Kick-off Meeting: |
 |
- Identify key individuals involved with the project.
- Set-up lines of communication.
-
Establish an overall project approach.
-
Set critical milestones for scheduling.
-
Develop a method for tracking document distribution.
-
Discuss key issues related to the project.
|
| Communication Tools: |
 |
- G. A. JOHNSON & SON will
develop call sheets and routing forms to be utilized by the Project Team.
- G. A. JOHNSON & SON
is also equipped with an E-mail address for electronic transfer of information.
|
| Project Master Scheduling: |
 |
- Provide an overall schedule to be used to determine critical dates to be met.
- Incorporate key milestone dates from
OWNERS
vendors and administration which have a direct bearing on the completion
of the project.
- Provide updates to this master schedule
on an as-needed basis.
|
| Project Meetings: |
 |
- Schedule, coordinate, and attend team meetings.
Maintain meeting minutes. Meeting times will be tracked in the Projects
Master Schedule.
|
| Drawing Review and Analysis: |
 |
- Review drawings in their current state and as the
design progresses. Provide a detailed analysis of items which we feel
should be addressed prior to issuance of bid documents.
|
| Owner Services: |
 |
- Provide evaluation and budgeting of specific
village and municipality requirements such as looping water
mains, providing easements, etc.
-
Analyze and determine cost/schedule impact of obtaining off-site utilities.
|
| Pre-award of Key Subcontracts: |
 |
- Identify key Subcontracts to be pre-awarded.
- Determine minimum amount of documentation
needed to initiate pricing of critical long-lead items.
- Solicit, receive, and analyze bids from vendors.
- Work together with the Project Team to award
these key contracts prior to completion of bid documents.
- Follow-up with selected vendor to insure
that project cost and schedule is maintained.
|
| Project Budgeting: |
 |
- Provide budgeting utilizing Roctec/Winscale
(electronic digitizer) and in-house unit pricing on an as-needed basis.
- If required, establish building standards
and pricing to be used for individual tenant fit-outs.
- Work with ARCHITECT to analyze and price
alternative means of construction and determine which is best suited
for projects cost and schedule requirements.
|
|
BIDDING AND NEGOTIATING:
Once project bid documents are complete, G.
A. JOHNSON & SON will provide the following services for bidding
and negotiating: |
| Develop Bid Packages: |
 |
- G. A. JOHNSON & SON will
thoroughly review all bid documents and provide a detailed breakdown
to be used for dissemination of these documents to Subcontractor bidders.
|
| Establish Bidders List: |
 |
- Provide a list of Subcontractors to be solicited
for bidding the project.
- Incorporate any Subcontractors which
OWNER wishes to include.
- Provide thorough prequalification for specific
Subcontractors as determined by the Project Team.
- Develop a fax invitation/instructions to
bidders outlining basic information about the project and specific information
regarding how & where Subcontractors may purchase drawings.
- Utilize SureFax to solicit listed Subcontractors
via fax notification.
-
Assemble responses from our invitations to
bid and establish a Subcontractor bidders list having a minimum of 5-7
bidders in major trades and 3-5 bidders in smaller dollar value trades.
- Distribute bid documents to Subcontractors
and key vendors.
|
| Provide Instructions to Bidders:
|
 |
- Work in conjunction with
ARCHITECT
to develop a complete Instruction to Bidders Form which will include
required alternatives, unit costs, cost breakdowns, project schedule,
and information outlining specific items to be priced.
|
| Bid Management/Analysis: |
 |
- Utilize an open-book
approach to assembling bids.
-
Log, disseminate and track all addenda and
follow-up bid documentation utilizing SureFax or
UPS Professional (for mailings).
- Receive, Log, and Track all questions received by Subcontractors.
- Provide a thorough analysis of all bids received
utilizing our Subcontractor bid recap forms.
- Provide a detailed summary of estimates indicating
a complete listing of trades/line items, Subcontractors selected, and
costs used for the project. This final estimate will then be presented
to the Project Team for final review/approval.
|
| Establishment of G.M.P.: |
 |
- Guaranteed Maximum Price will be established
after completion of bidding and final review of costs by the Project
Team as indicated above.
|
| Subcontract Award: |
 |
- Review bids and award Subcontracts for all trades on the project.
|
|
VALUE ENGINEERING:
G. A. JOHNSON & SON
will perform value engineering throughout the entire Preconstruction process.
Our services during this phase will include the following:
|
| - Price alternative means and methods of construction.
- Compare material availability with project cost constraints.
- Review/analyze impact of winter construction
on project cost & schedule.
-
Analyze product life cycle/durability - vs. - cost savings from less expensive product.
- Discuss methods of bidding which can be
utilized to reduce costs (i.e.: direct purchase of materials, combining
trade items to be purchased together - vs. - buying them separately.)
|
|
CONSTRUCTION PHASE PROJECT APPROACH
Administration: |
|
G. A. JOHNSON & SON
will maintain the following Construction Management staff to
administer, coordinate, and review all work: |
 |
- Preconstruction Manager (Part-time)
- Project Manager (Part-time)
- Site Superintendent (Full-time)
- General Laborer (Full-time)
- Safety Director (Part-time, as needed)
NOTE: All clerical
and accounting duties will be handled by our in-house administrative staff
at the G. A. JOHNSON & SON main office
in Evanston, Illinois. If required, a full-time on-site staff can be arranged. |
|
Project Kick-off Meeting:
The following items will be discussed prior to
mobilizing the project site and construction commencement. |
 |
- Establish Reporting Procedures Amongst the Project Team.
- Establish a Division of Duties.
- Review Field Conditions & Identify any
Potential Field Problems.
- Set-up System for Handling Job Site Questions.
- Discuss Job Site Safety & Security Rules.
- Plan Construction Traffic Flow.
- Discuss Initial Staging & Storage Requirements
with Subcontractors.
- Temporary Utilities.
- Scheduling & Phasing.
- Establish Procedures for Quality Control.
- Discuss Local Regulations & Labor Requirements, etc.
- If required, administer a plan for customer
safety during partial occupancy.
- Establish Shop Drawing log & distribution procedures.
|
| Cost Control:
G. A. JOHNSON & SON
utilizes several methods when monitoring and controlling a projects cost. These methods include:
|
 |
- Continually reviewing cost projections against
the approved budget as the project progresses. Elements with significant
variances against the projects budget will be identified and presented for discussion.
- Utilize a computer based software known as
Timberline to track all cost accounting issues on the project.
|
| Change Order Tracking:
Change orders will be tracked utilizing 2 methods: |
| | - Weekly meeting minutes
- Change order log
|
| Change Order Procedures: |
 |
- All of the OWNER'S
or Field Induced Changes will be Generated in the Form of an RFI (Request for Information).
- Any changes in the Field will be Recorded
as Part of the G. A. JOHNSON & SON
Site Superintendents Field Report.
- All Changes must be authorized by an
OWNER'S
Representatives signature.
-
Changes which Require Further Detail and
Pricing will be Authorized after a Bulletin Generated by the ARCHITECT
is Issued and Priced by G. A. JOHNSON & SON
and affected Subcontractors.
-
Pricing for changes will be addressed via a formal change order issued by the
G. A. JOHNSON & SON Project Manager.
There will be a mark-up on all changes of work. |
|
Monthly Reports & Submittals: |
 |
- G. A. JOHNSON & SON
will coordinate the submittal requirements of Subcontractor(s)
in accordance with agreed procedures and schedules.
-
G. A. JOHNSON &
SON will develop, implement, and maintain a submittal log for
monitoring sworn statements.
-
G. A. JOHNSON & SON will review all submittals by Subcontractors for completeness,
accuracy, and conformance with contract documents and submit a formal
application and certification for payment to the OWNER.
|
|
Management of Job Site Safety & Security: |
|
G. A. JOHNSON & SON takes safety seriously and treats it as our number
one priority. Our motto SAFETY PAYS
was created by our
safety committee which includes our President, Jack Galbraith, our full-time
Safety Director, Ed Pleines, and our part-time independent Safety Consultant,
Michael E. Barnhart & Associates. |
|
With that said, G. A. JOHNSON & SON
is proud to announce the folling safety rating which is ranked substantially
below the construction industries national average: |
|
EXPERIENCE MODIFICATION RATING |
1999 : |
.86 |
 |
1998 : | .90 |
| | 1997 :
| .86 | | |
1996 : | .86 | |
|
The duties performed during this phase will include: |
 |
- Prepare and recommend a detailed security
plan to restrict access and provide security to the site.
- Ensure that requirements of the agreed security,
health, and safety plans are incorporated in Subcontract documents.
- Coordinate Subcontractors and suppliers
efforts to comply with plans during construction, confirming that their
programs are in place and being implemented.
|
| Quality Assurance:
As required by
OWNER,
G. A. JOHNSON & SON will manage
the quality of the project by performing the following duties prior to installation: |
| |
-
Mock-ups
-
Lab Testing -
Check list |
| Project Turnover & Completion of Work:
With the Project Team, G. A. JOHNSON & SON
will ensure that the Subcontractors establish
and manage a full and comprehensive commissioning procedure for undertaking
the following activities: |
 |
- OWNER'S
acceptance of the building on practical completion.
- Obtaining operations and maintenance manuals,
as-built drawings, maintenance manuals, shop drawing log, etc.
- Arranging a smooth hand-over to building
management staff.
- Completion of punch list items.
- Paying final accounts.
- Training the
OWNER'S
building management, operations, and maintenance staff.
|